Solar for plants that can't stop running.
Electricity is one of your largest controllable costs. We deliver turnkey solar EPC — design, procurement, installation, grid connection and commissioning — sequenced around your production schedule, with battery storage available within the same scope.
C&I solar fails on execution, not technology
The panels work. What goes wrong is everything around them: timelines that slip past committed dates, crews that disrupt production, quality shortcuts invisible until generation underperforms, and vendors who stop answering the phone after commissioning. An industrial buyer needs an infrastructure partner, not a panel supplier.
- Work scheduled around your shifts, with a site safety plan agreed before mobilisation
- Materials inspected against specification at delivery, with full traceability
- Daily progress visible in ONAQT — photographed, GPS-stamped, time-stamped
- Net metering, DISCOM inspection and CEIG approval handled by us, start to finish
Savings of up to 70% on the energy bill, with payback typically inside 3–5 years — modelled conservatively, in writing, before you commit.
Five stages, each signed off before the next
A typical rooftop project runs 10–16 weeks from order to energisation, depending on capacity and DISCOM timelines. You'll have the schedule in week one.
Planning and mobilisation
Design frozen, procurement scheduled, site safety plan agreed with your operations team. Work is sequenced so production never waits for us.
Procurement and inspection
ALMM-listed modules and Tier-1 inverters, checked against engineering specification at delivery. Substitutions don't happen quietly.
Installation
Certified crews execute mounting, cabling and inverter works. Every day closes with photo-proof work orders in ONAQT that you can review remotely.
Grid connection
We manage the net-metering application, DISCOM inspection and CEIG approval, then run string-level testing and performance validation before energisation.
Handover
As-built documentation, warranties, the O&M plan, and a measured generation baseline that anchors your savings tracking from month one.
What the numbers look like
Figures below are typical for well-sited Indian C&I rooftops; your feasibility study replaces them with numbers specific to your facility.
- Up to 70% off the bill
- High-efficiency systems engineered against your measured load profile, not a nameplate assumption.
- Payback in 3–5 years
- Followed by roughly two decades of generation at near-zero marginal cost.
- 40% depreciation, year one
- Section 32 accelerated depreciation, plus GST input credit on modules, inverters and EPC for registered buyers — confirmed with your CA.
- Storage in the same scope
- Battery systems for backup or peak-hour shifting, engineered into the original design rather than bolted on later.
The habits of an infrastructure company
We came to solar from twenty years of building telecom and EV infrastructure that had to work on day one and keep working. Those habits carry over.
A field force of our own
150+ field staff on our payroll, working to telecom-grade deployment discipline. We don't discover our subcontractor's standards on your roof.
One contract, one throat to choke
Design, EPC, approvals and O&M under a single agreement. When something needs fixing, there is no question of whose job it is.
Enterprise track record
Two decades as an infrastructure partner to major enterprises. References available on request — ask, and we'll arrange the calls.
Walk us around your facility.
A site visit and your last twelve months of bills are enough for a serious first answer: capacity, cost, savings and schedule.
Arrange a site assessmentWhat happens next: a 30-minute call, no obligation. Bring your last 12 months of electricity bills if you have them. We reply to every enquiry within one working day — or call us on +91 774-300-8365.